Site Visit: Silver Spring Addition

The Addition to this Ranch style home has been under construction for almost two months. Demolition of the existing sunroom, exterior concrete stair was completed in about a week. This included saw cutting of the existing carport concrete slab for the new mudroom foundations and removing the existing kitchen cabinets. Framing of the Additions proceeded for the next two weeks and required covering the roof with a tarp to prevent leaks into the existing portions of the house. The taller dining room ceiling and large window openings already feels really spacious adjacent to the existing kitchen. Over the last few Read More